Dr. Qiang ZENG
Position: Vice Professor
Phone: +86 15036512520
Email: zengqiang@hpu.edu.cn
Office: Rm. 510, Energy Science and Engineering Building, Mail Campus
Qiang Zeng is a vice professor and supervisor of postgraduate in School of Energy Science and Engineering. He obtained his PhD in 2010 from Chongqing University, China, and has been worked as a teacher majored in Industrial Engineering since 2002.
Over the course of his career, Vice Professor Zeng has worked in a wide range of Industrial Engineering in China, such as Production Plan and Control, System Simulation, Management Information System, Quality Management, Logistics Management. Vice Professor Zeng’s current focus is on Job-shop Scheduling Optimization.
Current research interests:
Job-shop Scheduling Optimization
Selected publications:
Q. Zeng, et al: Optimal manufacturing tasks assignment method based on multi-objectives, Computer Engineering and Applications, 2010, Vol 46, No 5, pp.17-20.
Q. Zeng, et al: Multi-objective optimization method for tasks scheduling of large-scale engineering project, Computer Engineering and Applications, 2010, Vol 46, No 24, pp.217-221.
Q. Zeng, et al: Multi-objective optimization method for Job-shop scheduling, Computer Engineering and Applications, 2010, Vol 46, No 23, pp.215-218.
Q. Zeng, et al: Multi-objective Optimization Scheduling for Job Shop of Batch Production with Multiple Process Flows, China Mechanical Engineering, 2011, Vol 22, No 2, pp.190-196.
Q. Zeng, et al: Multi-Objective Optimization for Equal Batch Splitting Flexible Job-Shop Scheduling Problem with Multiple Process Flows, Advanced Science Letters, 2011, Vol 4, No 4-5, pp.1808-1813.
Q. Zeng, et al: Optimal model and algorithm for flexible job-shop scheduling problem based on demand time window, Journal of Chongqing University, 2011, Vol 34, No 2, pp.86-94.
Q. Zeng, et al: Integrated multiobjective optimization for FJSP based on multiple rule machine assignment and job sequencing, Computer Integrated Manufacturing Systems, 2011, Vol 17, No 5, pp.980-989.
Q. Zeng, et al: Integrated multi-objective optimization method for equal lot splitting flexible job-shop scheduling problem. Computer Engineering and Applications, 2012, Vol 48, No 16, pp.237-243.
Q. Zeng, et al: Multiobjective optimization for batch production FJSP based on just in time delivery, Computer Integrated Manufacturing Systems, 2011, Vol 17, No 8, pp.1780-1789.
Q. Zeng, et al: Multi-objective optimization method for equal lot scheduling problem of Job Shop with parallel machines, Computer Integrated Manufacturing Systems, 2011, Vol 17, No 4, pp.816-825.
Q. Zeng, et al: Simulation optimization for multi-type and batch production system based on Witness.Computer Engineering and Applications, 2012, Vol 48, No 21, pp.209-216.
Q. Zeng, et al: Multi-objective optimization method for workshop facility layout based on NSGA II, Computer Engineering and Applications, 2012, Vol 48, No 27, pp.223-228.
Q. Zeng, et al: Research on Multi-objective Optimization for Equal Batch Splitting FJSP under Parallel and Sequence Shift Mode, Journal of System Simulation, 2012, Vol 24, No 5, pp.1046-1052.
Q. Zeng, et al: Simulation optimization for input plan of multi-type and batch production with flexible process, Journal of Chongqing University, 2012, Vol 35, No 8, pp.107-115.
Q. Zeng, et al: Multi-objective elaborate scheduling method for batch production FJSP, Computer Engineering and Applications, 2014, Vol 50, No 2, pp.263-270
Q. Zeng, et al: Multi-objective scheduling method for batch production FJSP with dual resource, Computer Engineering and Applications, 2015, Vol 51, No 1, pp.250-256+260.
Q. Zeng, et al: Improved method to optimize aggregate production planning based on dynamic programming, Computer Engineering and Applications, 2014, Vol 50, No 21, pp.248-253.
Q. Zeng, et al: Heuristic balancing schedule method for complicated assembly line of single product. Computer Engineering and Applications, 2014, Vol 50, No 7, pp.263-270.